Project

General

Profile

IEC 61850 Certificate #2891

DW-SPiN-LlD SA Local Information Process [Daewoong Electric Co. Ltd.]

Added by Herbert Falk over 2 years ago. Updated over 2 years ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 1
61850 Tested Aspects:
Server
Company:
Daewoong Electric Co. Ltd.
Address:

10, Hwanggeum-ro 127beon-gil, Yangchon-eup.
Gimpo-si, Gyeonggi-do, Republic of Korea, 10048

Product:
DW-SPiN-LlD SA Local Information Process
HW Version:
SW Version:
1.0.0
Key Words:
Comm, Measurement
Test Procedure Version:

3.3a

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
bruce.muschlitz
Approval Date:
11/20/2019
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Korea Electrotechnology Research Institute (A)
Test Document:
Certificate Name:
19TC201865-R1
Certificate Hash:
C3CFFA47B6971DC20A9C959291732CC351565100021E493170359008A7B06B91
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:

Description

This certificate and its information was migrated from a previous database


Files

Also available in: Atom PDF