Project

General

Profile

IEC 61850 Certificate #2799

DW-SPiN-ICM Protocol Converter [Daewoong Electric Co. Ltd.]

Added by Herbert Falk almost 3 years ago. Updated almost 3 years ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 1
61850 Tested Aspects:
Server
Company:
Daewoong Electric Co. Ltd.
Address:

10, Hwanggeum-ro 127beon-gil, Yangchon-eup.
Gimpo-si, Gyeonggi-do, Republic of Korea, 10048

Product:
DW-SPiN-ICM Protocol Converter
HW Version:
SW Version:
1.0
Key Words:
Comm, Gateway
Test Procedure Version:

3.2

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
bruce.muschlitz
Approval Date:
01/17/2019
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
Korea Electrotechnology Research Institute (A)
Test Document:
Certificate Name:
2019TS00008
Certificate Hash:
857A01F1044AEF7708ED890BCF0FC9F41E686832AF3E1486E6DAE98A83096225
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:

Description

This certificate and its information was migrated from a previous database


Files

Also available in: Atom PDF