IEC 61850 Certificate #2717
Easergy MiCOM P741 Busbar Protection Rel [Schneider Electric Industries SAS]
Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Server
Company:
Schneider Electric Industries SAS
Address:
35 rue Joseph Monier
92500 Rueil-Malmaison,
France
Product:
Easergy MiCOM P741 Busbar Protection Rel
HW Version:
M
SW Version:
B1
Key Words:
Protection, Relay
Test Procedure Version:
1.0
IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Setting Group (B4), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
bruce.muschlitz
Approval Date:
04/05/2018
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
DNV Netherlands (A)
Test Document:
Certificate Name:
10074098-INC 18-2062
Certificate Hash:
494F584D7C2EDFAE22F3EBA645078FB1AD52CA4C51E736ED3B879886F5BA1C7A
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Schneider Electric
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:
Product Variants:
Time Activated Control:
Description
This certificate and its information was migrated from a previous database
Files