Project

General

Profile

IEC 61850 Certificate #2505

889 Generator Protection Sys. [GE Multilin]

Added by Herbert Falk almost 3 years ago. Updated almost 3 years ago.

Status:
Approved
Priority:
Normal
61850 Edition:
Edition 2
61850 Tested Aspects:
Server
Company:
GE Multilin
Address:

650 Markland St.
Markham, ON L6C 0M1
Canada

Product:
889 Generator Protection Sys.
HW Version:
SW Version:
1.60
Key Words:
Protection
Test Procedure Version:

1.0

IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Sets (B2), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
kathy.ellis
Approval Date:
03/28/2016
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
DNV Netherlands (A)
Test Document:
Certificate Name:
74108094-OPE/INC 16-1750
Certificate Hash:
354F914AE15762C0CF46E1AF2859FB45719A29ED94784800B69BB58100BE00E5
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:

Description

This certificate and its information was migrated from a previous database


Files

Also available in: Atom PDF