IEC 61850 Certificate #1978
FeederVision FVD [P&B Engineering]
Status:
Approved
Priority:
Normal
61850 Edition:
Edition 1
61850 Tested Aspects:
Server
Company:
P&B Engineering
Address:
Belle Vue Works
Boundary Street
Manchester
M12 5NG
UK
Product:
FeederVision FVD
HW Version:
SW Version:
2.022
Key Words:
Protection, Relay
Test Procedure Version:
2.2
IEC 61850 Blocks Certified:
Basic Exchange (B1), Buffered Reporting (B6), Data Set Definition (B2+), Direct Control (12a), Enhanced Direct Control (12c), Enhanced SBO Control (12d), GOOSE Publish (9a), GOOSE Subscribe (9b), SBO Control (12b), Time Synchronization (B13), Unbuffered Reporting (B5)
Certificate/Result Reviewer:
rebecca.davenport,kathy.ellis
Approval Date:
07/06/2015
Standards Tested:
61850-6, 61850-7-1, 61850-7-2, 61850-7-3, 61850-7-4, 61850-8-1
Current Test Lab Name:
DNV Netherlands (A)
Test Document:
Certificate Name:
30820234-Consulting 09-0762
Certificate Hash:
1574E93D453BA625EB983E62CE296A264BF203E725F358987B2D0B3002858993
Vendor Artifact File Name:
Vendor Artifact Hash:
Umbrella Organization:
Optional Reservation Test:
No
Serial Number:
Publisher Legacy Variants:
Publisher Preferred Rates:
Publisher Preferred Variants:
Subscriber Legacy Variants:
Subscriber Preferred Variants:
Subscriber Preferred Rates:
Product Variants:
Time Activated Control:
Description
This certificate and its information was migrated from a previous database
Files