Redmine IEC 61850 User Feedback Task Force - Feature #6739 (New): How to deal with 'Beh' and 'Health' of ...https://redmine.ucaiug.org/issues/67392024-03-18T10:37:35ZMichael Haecker
<p>For site testing, users shall use the test mode to isolate devices/functions to prevent from flooding control centres with test data.</p>
<p>Whereas data marked "test" can be filtered out, changes of 'Beh' cannot be filtered out. When, for example, changing the active parameter set, the user will create data towards the control centre for LN instances which are activated/inactivated through this change.<br />[Part 7-4 Annex A: "Regardless of the status of LN.Beh, the quality test attribute of Mod, Beh and Health shall be q.test=false."]</p>
<p>In an automation system where a gateway is used to interface the control centre, this gateway could implement a feature to block the information flow of a device in test. Where a direct link via IEC 61850 is used, such blocking is not possible.</p> IEC 61850 User Feedback Task Force - Bug #6737 (New): Amending TGSN LN class with signal characte...https://redmine.ucaiug.org/issues/67372024-03-18T09:57:10ZMichael Haecker
<p>The model of a generic sensor does not provide characteristics about the analogue signal type which is used to receive the sensor value.</p>
<p>TC57/WG18 are proposing to amend the model with a setting to state the analogue signal type.</p> IEC 61850 TPWG - Bug #6622 (Rejected): Test case Ttf1 (mustUnderstand) for the ICT conformance te...https://redmine.ucaiug.org/issues/66222023-12-06T16:41:38ZKaren Wyszczelski
<p>The test should be modified to test three scenarios.</p>
<p>An element has a mustUnderstand in the communication section of the IED being configured, but the IED being configured does not support it.<br /> The ICT should reject the configuration of the IED and provide an error message.</p>
<p>An element has a mustUnderstand outside the scope of the IED being configured.<br /> The ICT should import the file.</p>
<p>An element has a mustUnderstand element that is in another device but the SCD is configured for use in the IED being configured.<br /> The ICT should reject the configuration of the IED and provide an error message.</p>
<p>Currently mustUnderstand is only used for R-GOOSE and R-SV.</p> IEC 61850 User Feedback Task Force - Bug #6596 (Resolved): Simulation Mode with Centralized Prote...https://redmine.ucaiug.org/issues/65962023-11-12T10:40:07ZDustin Tessier dtessier@tescoautomation.com
<p>During a recent vPAC Alliance meeting the topic of LPHD.Sim was discussed and how it would not support a centralized protection scheme, which forces the entire physical device (centralized computing platform) to be placed into simulation mode. Ideally the simulation modes could be applied to LDs (similar to test mode via LLN0), however this would create backwards compatibility issues. The other option is to not use simulation mode, and use the LN's InRef's tstEna/setTstRef data objects to dynamically subscribe to the test set.</p> IEC 61850 User Feedback Task Force - Bug #6263 (Resolved): GOOSE MinTime / Max Time - Probable di...https://redmine.ucaiug.org/issues/62632023-02-14T11:24:58ZAbhilash Appukuttanabhilash.appukuttan1@ge.com
<p>In Part 6, the MinTime and MaxTime is expressed as 'Decimal'</p>
<p><xs:complexType name="tGSE"><br /><xs:complexContent><br /><xs:extension base="tControlBlock"><br /><xs:sequence><br /><xs:element name="MinTime" type="tDurationInMilliSec" minOccurs="0"/><br /><xs:element name="MaxTime" type="tDurationInMilliSec" minOccurs="0"/><br /></xs:sequence><br /></xs:extension><br /></xs:complexContent><br /></xs:complexType><br />---<br /><xs:complexType name="tDurationInMilliSec"><br /><xs:simpleContent><br /><xs:extension base="xs:decimal"><br /><xs:attribute name="unit" type="tSIUnitEnum" use="optional" fixed="s"/><br /><xs:attribute name="multiplier" type="tUnitMultiplierEnum" use="optional" fixed="m"/><br /></xs:extension><br /></xs:simpleContent><br /></xs:complexType></p>
<p>However, in 8-1, the MinTime and MaxTime is an Unsigned32 / INT32U</p>
<p>MinTime Unsigned32 r o INT32U – As specified in the SCD<br />file for the GoCB, See 1<br />MaxTime Unsigned32 r o INT32U – As specified in the SCD<br />file for the GoCB. See 1</p>
<p>What shall the ICT process the values as? Input as Decimal and then pass it as Integer to the application?</p>
<p>Or does it makes sense to change the -6 to have these values as Integer?</p>
<p>If you look at Table 45 in -6, it does point to that way.</p>
<p>INT8, INT16, INT24, INT32,<br />INT64<br />INT8U, INT16U, INT32U</p>
<p>integer</p>
<p>An integer number, no decimal fraction (99999)</p> IEC 61850 User Feedback Task Force - Bug #6256 (Resolved): IEC 61850-7-4 list of abbreviationshttps://redmine.ucaiug.org/issues/62562023-02-09T19:27:57ZMichael Haecker
<p>Clause 4.2 / Table 1 of Part 7-4 lists the abbreviations used in data object names.</p>
<p>In this list entries exist which refer to (parts of) former DO names. When removing DO / changing DO names of former versions, model managers of other Parts do not inform the Part 7-4 editor to delete the entries from the list.</p>
<p>The standard (and the web access datamodel) expose abbreviations which are not used any more.</p>
<p>Example: string "Ia" : 16 entries</p> IEC 61850 User Feedback Task Force - Feature #6246 (Resolved): ExtRef cannot specify a Poll inten...https://redmine.ucaiug.org/issues/62462023-02-02T13:01:21ZVladan Cvejic
<p>Via the ExtRef element an SCT can specify expected inputs to an IED and may state a serviceType indicating a service used to receive the data. In most cases, i.e. GOOSE, Report and SV, the serviceType refers to a specific service defined in 7-2.</p>
<p>But -6 is less precise about serviceType=Poll, "… the client shall / will poll the input data by means of read requests."</p>
<p>Which form the Poll read request takes i.e., GetDataValues or GetDataSetValues cannot be specified using the schema and is left to the respective ICTs to sort out.</p>
<p>But a customer may prefer to use GetDataSetValues to minimize network bandwidth utilization or to minimize burden on the IED since the comparable GetDataValues requests are quite large. While a customer may specify an ExtRef and add a DataSet to the IED for this purpose, the DataSet would appear to be unused and could be removed accidentally.</p> IEC 61850 User Feedback Task Force - Bug #6226 (Resolved): In the downgrading rules from ed 2.1 t...https://redmine.ucaiug.org/issues/62262023-01-17T09:05:39ZAurelie Dehouck
<p>61850-6 ed2.1 mention in I.4.2.4 "New CDC":</p>
<p>"The CDC ORS has been added to the list of the allowed CDCs. DOType whose CDC=ORS shall be excluded from the export to an 2007B environment. This includes also DO instances using this type."</p>
<p>But other CDCs were also added (cf tPredefinedCDCEnum, or 7-3): CST, VSD and TCS<br />Why shouldn't they be excluded also ?</p> IEC 61850 User Feedback Task Force - Bug #6175 (In Progress): SCL SICS requires SNTP even with 2....https://redmine.ucaiug.org/issues/61752022-11-06T14:40:52ZHerbert Falk
<p>See attached problem report.</p> IEC 61850 User Feedback Task Force - Feature #5336 (In Progress): Extension of the AddCause requi...https://redmine.ucaiug.org/issues/53362022-04-01T14:47:43ZAndreas Ostermeier
<p>During the review of the control model of the Proxy/Gateway in IEC 61850-80-6 we found that the existing enumeration for the AddCause does not include values to reflect the situation where the Proxy/Gateway issues a negative confirmation to the control center client when the communication with the underlying IED that executes the command is disturbed, or the connection to the device is lost. <br />This issue is not only relevant for the communication to the control center, but on always when the control action involves more than one communication level, e.g. Substation Scada to Breaker IED via an bay controller IED. <br />Attached is a slide set which explains the need and proposes the new enumerated values for the AddCause.</p> IEC 61850 User Feedback Task Force - Bug #3101 (Resolved): IEC61850.Tissue #1755 Event driven sch...https://redmine.ucaiug.org/issues/31012021-08-10T09:59:06ZHenry Dawidczak
<p>Part 7-4, page 169/482, clause 6.6.9 table 70:<br />The possibility to stop an event driven schedule by another event is missing.<br />Defining an additional DO would allow that starting and stopping a event driven schedule could be represented by two independent trigger events.</p>
<p>Example: A local DO event may represent a communication failure. The transition (False to True) of the DO referenced by InSyn could indicate that the communication has a failure (which should start a specific schedule). The transition (False to True) of the DO referenced by (new) DO InSynStop could indicate that the communication is again operating properly (which should cause the schedule to stop immediately).</p> IEC 61850 User Feedback Task Force - Bug #611 (In Progress): Need a new DO (ENUM) to identify the...https://redmine.ucaiug.org/issues/6112021-02-15T19:01:57ZCarlos Rodriguez del Castillo
<p>This ENUM will allow to identify the type of the distant center (104, IEC61850), in case several centers are connected to the substation.<br />Helpful for maintenance and exploitation of the system.</p> IEC 61850 User Feedback Task Force - Feature #590 (Resolved): ICT fails to check validity of the ...https://redmine.ucaiug.org/issues/5902021-02-03T20:07:40ZHerbert Falk
<p>Client/server test.<br />The data model uploaded in the Client from the SCD file (v7) shows 32 Buffered Report CB (brcbA01=>16 and brcbB01=>16). While trying to enable the BRCB “brcbA12”, we got an error response (object non existent).<br />In fact, this report brcbA12 doesn’t exist in the IED. It seems that the SCD, while instancing the RCB, exceeds the IED capabilities :<br />Extract from ICD file :<br /><ReportControl name="brcbA" confRev="0" buffered="true" desc="System Logical Device Report Control Block"> (…) <RptEnabled max="8"/></p>
<p>Extract from SCD file<br /><ReportControl name="brcbA" confRev="60000" rptID="L2_PU_GE_P443_Meas" buffered="true" desc="System Logical Device Report Control Block" (…) <RptEnabled max="16"></p> IEC 61850 User Feedback Task Force - Bug #439 (Resolved): How to add utility process name to DOshttps://redmine.ucaiug.org/issues/4392021-02-03T20:07:32ZHerbert Falk
<p>Currently SCL has poor support for handling gateway/RTU-funktions where signal names are translated for remote communication. The specified sigal has a utility process name independent of used protcol. E.g. "start of distance protection". This needs to be associated with its IEC 61850 implementation (xxPDIS1.Str.general, xxPDIS2.Str.general etc.). The 80-1 part describes how 104 addresses can be added to SCL but also other utility fields are important to be able to include in SCL for specification and documentation purposes. Desired solution by Vattenfall is to have vendors use DA description to add utility process name.</p> IEC 61850 User Feedback Task Force - Feature #438 (Resolved): The engineering-process is well def...https://redmine.ucaiug.org/issues/4382021-02-03T20:07:32ZHerbert Falk
<p>The engineering-processen is well defined for a green field / new IEC 61850 substation but needs clarification for refurbishment and extensions. In a green field project Vattefall starts by defining the SSD and hands it over to supplier as part of the bid for tender. Clarification of the process for an existing substation is required. Here utility needs to start by extending or modifying an existing SCD substation from original supplier. How are the modified parts of substation section handled? Can a SSD be created that maintains links to existing communication and IED structures, into which a new supplier can continue work? (61850-6:2009 clause 10 needs to define also "specification tool" besides system configurator. Can data flow engineering rights and SED files that be used for this use case?)</p>