UCAIug Issue Tracking System: Issueshttps://redmine.ucaiug.org/https://redmine.ucaiug.org/favicon.ico?15861924492024-02-07T10:55:45ZUCAIug Issue Tracking System
Redmine 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6699 (New): Behavior of a function while being dynamica...https://redmine.ucaiug.org/issues/66992024-02-07T10:55:45ZKeith Gray
<p>LN.blk is active.<br />What happens with the functionality such as timers and outputs?</p> 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6698 (New): Integrate work from AHTF Control Between Fu...https://redmine.ucaiug.org/issues/66982024-02-07T08:08:31ZKeith Gray
<p>Collect the work created by this AHTF and integrate it into 7-5 and 7-500. We need to locate the latest draft of the document, review that draft, and determine how to integrate it with our documents.</p> 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6686 (New): Description of the different control method...https://redmine.ucaiug.org/issues/66862024-01-23T17:02:54ZHenry Dawidczak
<p><a class="external" href="https://iec61850.tissue-db.com/tissues/1892">https://iec61850.tissue-db.com/tissues/1892</a><br />Tissue requests to remove TapOpStop from LN ATCC. This bring me to the need to describe the different methods to control OLTC in manual and automatic mode.</p> 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6684 (New): Proposal to deprecate 'LocSta' in X and Y g...https://redmine.ucaiug.org/issues/66842024-01-22T08:50:33ZMichael Haecker
<p>It is the purpose of 'LocSta' to define the level of control authority (remote control center vs. substation).<br />Since controls are to be managed by the corresponding CSWI LN instances, A-group LN instances respectively, control commands are not managed by X and Y class LN instances.</p>
<p>It is proposed to deprecate 'LocSta' in X and Y group LN classes.</p> 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6607 (New): Create DO indicating the source of synchron...https://redmine.ucaiug.org/issues/66072023-11-21T14:49:30ZVladan Cvejic
<p>Proposal to add in LTMS a DO indicating the current source of synchronisation of the IED. This should be done in a consistent way with SynSrcId added in the SV ADSU in 9-2 ed2.1.<br />Proposal: add new DO (> 64 bit ) to LTMS and MMXU.</p> 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6606 (New): CPU monitoringhttps://redmine.ucaiug.org/issues/66062023-11-21T14:40:37ZVladan Cvejic
<p>Add a LN allowing to monitor CPU state of an IED (CPU load, temperature, available RAM and disc space, ...).<br />These informations could be used in client as local / remote HMI to monitor the substation.</p> 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6562 (New): Missing LN for Miniature Circuit Breaker (MCB)https://redmine.ucaiug.org/issues/65622023-10-26T10:17:53ZKeith Gray61850-7-5 and 61850-7-500 - IEC61850-7-5 #6560 (New): Multiple information sourceshttps://redmine.ucaiug.org/issues/65602023-10-26T09:02:25ZKeith Gray
<p>Today, each protection relay comes with its own XCBR model included. In a system, where Main1, Main2, Backup protections are provided from three devices, which XCBR model gets the preference?</p> 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6559 (New): Modelling of a Lockout/trip seal-in relayhttps://redmine.ucaiug.org/issues/65592023-10-26T09:01:50ZKeith Gray61850-7-5 and 61850-7-500 - IEC61850-7-5 #6558 (New): How to model composed functionshttps://redmine.ucaiug.org/issues/65582023-10-26T09:01:23ZKeith Gray
<p>Ex.: undervoltage controlled busbar protection - The main protection principle is PDIF, but how to address the voltage aspect?</p> 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6557 (New): Modelling of various MCB tripshttps://redmine.ucaiug.org/issues/65572023-10-26T09:00:49ZKeith Gray61850-7-5 and 61850-7-500 - IEC61850-7-5 #6556 (New): How to impact the data quality of a data wi...https://redmine.ucaiug.org/issues/65562023-10-26T09:00:10ZKeith Gray
<p>Ex: For a client, how to invalidate the data qualities of the data of an IED which cannot be reached any longer?</p> 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6555 (New): Behaviour of output contacts when LN is in ...https://redmine.ucaiug.org/issues/65552023-10-26T07:52:10ZKeith Gray61850-7-5 and 61850-7-500 - IEC61850-7-5 #6537 (New): Harmonizing expressions in 7-500 Ed.1https://redmine.ucaiug.org/issues/65372023-10-06T13:13:34ZMichael Haecker
<p>In IEC/TR 61850-7-500 Ed.1<br />the term</p>
<pre><code>"BIED" (Breaker IED means process near circuit breaker controller same as CBC)<br />is used in a mix with the term<br /> "CBC" (Process near circuit breaker controller IED according to IEC 62271-3 instead of BIED (breaker IED))</code></pre>
<p>and the term</p>
<pre><code>"SIED" (Switch IED means process near disconnector/earthing switch controller same as DCC and/or ESC)<br />is used in a mix with the terms<br /> "DCC" (Process near disconnector controller IED according to IEC 62271-3<br />instead of SIED (switch IED)) and<br /> "ESC" (Process near earthing switch controller IED according to IEC 62271-3 instead of SIED (switch IED)).</code></pre>
<p>In drawings only one of the parallel terms is used.</p>
<p>This is to propose to use only one of the parallel terms and to put a general note referring to the other one.</p> 61850-7-5 and 61850-7-500 - IEC61850-7-5 #6497 (New): Explanation text of IEC/TR 61850-7-500 clau...https://redmine.ucaiug.org/issues/64972023-08-02T15:43:25ZMichael Haecker
<p>The explanation text to IEC/TR 61850-7-500 Figure 10 provided in clause 10.1.1.2 is not clear enough.<br />The last graph needs to be explained in a better way.</p>